UKRS provides independent inspection, integrity testing and verification of attenuation tank liners and associated geomembrane systems.
Attenuation tanks temporarily retain stormwater before releasing it at a controlled rate. The liner must therefore remain continuous so that stored water is retained and released in accordance with the drainage design.
Defects may occur during handling, installation or the placement of tank components.
Common issues include:
Once the liner has been covered, locating and repairing defects can become difficult and expensive.
Independent integrity testing allows defects to be identified while the membrane remains accessible.
CIRIA guidance applies the principle that geomembrane verification within SuDS installations should be undertaken independently of the barrier installer.
UKRS provides an impartial assessment of the installation and records defects, repairs and retesting before the system is covered.
Our services can include:
Testing should be undertaken once the liner and associated details are complete but before the system is covered.
The liner should be:
The installation contractor should remain available to complete repairs so that retesting can be undertaken without delaying the construction programme.
Following testing, UKRS can issue a report containing:
The report provides a quality assurance record for the client, drainage designer, contractor and approving authority.
Our liner integrity testing services can support:
Provide the tank drawings, liner specification, dimensions and installation programme to receive a quotation.